Guide · 8 min read

How much does a general contractor charge in Florida?

There is no single rate. What a general contractor charges depends on the contract type, the scope and what the contract protects. Here is how pricing works, what Florida law says about deposits and how to compare bids.

Darvin Kitchen: one licensed contractor from design to installation, Venice to Tampa.

Published

On this pageHow much does a general contractor charge in Florida?What are the common ways a general contractor charges?What does a general contractor’s price include?How much deposit can a Florida contractor ask for?What must a Florida residential contract include?How do I compare general contractor bids?Frequently asked questions

Key takeaways

  • There is no public rate card or standard markup: the price is the cost of the work plus overhead and profit, and the contract type decides who carries overruns.
  • Bids come in three main shapes: fixed price, cost-plus (actual costs plus a fee) and cost-plus with a cap. The model decides who pays when costs run over.
  • Florida’s s. 489.126 sets deadlines, not a deposit cap: if the first payment tops 10 percent of the price, the contractor must apply for permits within 30 days and start within 90 days after they issue.
  • Residential contracts above $2,500 generally need the recovery fund and construction lien notices, and every proposal must show the contractor’s license number.
  • Compare bids on one written scope, with allowances, exclusions, payments and change orders side by side.
Kitchen under construction behind plastic dust sheeting, with base cabinet boxes set in place and tools resting on top
Base cabinet boxes in place behind plastic sheeting.

How much does a general contractor charge in Florida?

There is no single Florida rate. A general contractor charges the cost of the work (labor, materials, subcontractors) plus overhead and profit, and how those appear on your bill depends on the contract. BuildingAdvisor wrote in 2016 that there is no industry standard for markup, which varies by job type, region and market.

The most current benchmark is NAHB’s 2026 Remodelers’ Cost of Doing Business Study: for 2024, remodelers averaged a 29.9% gross profit margin and a 6.3% net profit margin. NAHB’s summary does not define either margin, so treat them as industry context, not a markup or a price check.

Margin and markup differ. A margin is a share of the price you pay; a markup is a share of the contractor’s cost. A 25 percent markup on $100 of cost makes a $125 price, a 20 percent margin. Ask which one a quoted percentage is.

What are the common ways a general contractor charges?

Most residential bids fall into three structures: fixed price, cost-plus, and cost-plus with a cap. The difference is who pays when costs run over.

ModelHow you payWho carries overrunsWatch for
Fixed priceA set total for a defined scope. Per Consumer Reports (2016), it covers labor, materials, profit and a contingency cushion.Mostly the contractor, for foreseeable overrunsVague scope, low allowances, cut corners
Cost-plusActual costs plus a fee or percentage; sometimes called time-and-materialsThe homeowner; no contingency is built inOpen-ended totals and billing you must track
Cost-plus with a capActual costs plus a fee, up to a guaranteed maximum or not-to-exceed priceThe cap limits what you can be chargedWhat can raise the cap; whether savings are shared

BuildingAdvisor’s author prefers a fixed price in most cases, if the scope will not change much after work starts, and says cost-plus can be a necessity when many unknowns exist. Consumer Reports notes that a cost-plus owner keeps any savings if the job finishes under budget. Under cost-plus, ask for a cap and itemized billing.

Two terms appear in every model. Allowances are placeholder amounts for items not yet chosen, and pricier picks raise the price. Change orders record scope changes, and some contractors charge an administrative fee for each. Ask about both before you sign.

What does a general contractor’s price include?

A complete price covers the written scope: labor, materials, subcontractors, and the contractor’s overhead and profit. Anything the scope leaves out is not in the price.

Check permits and inspections (who applies and who pays the fees), demolition and disposal, what each allowance buys, exclusions such as appliances or backsplash, and whether a fixed price includes a contingency and who keeps the unused part.

Published cost ranges are in the kitchen remodel cost guide and budget rules of thumb; they are third-party estimates, not quotes. A single “turnkey” number should still be itemized; see turnkey kitchen remodeling for what that approach covers.

How much deposit can a Florida contractor ask for?

Section 489.126 sets deadlines, not a deposit cap. If the first payment on residential work exceeds 10 percent of the contract price, the contractor must apply for needed permits within 30 days and start work within 90 days after they issue. Just cause, or your written agreement to a longer period, excuses the deadlines.

A contractor holding more than the value of the work performed may not go 90 days without doing any work, or the period the contract sets (s. 489.126(3)). If a contractor misses these deadlines, ask a Florida construction attorney or DBPR what you can do.

Local guidance goes further than the statute: Hillsborough County advises paying no more than 10 percent before work starts, and UF/IFAS suggests tying draws to percent complete.

What must a Florida residential contract include?

Florida requires specific notices and the contractor’s license number. Scope, schedule and payments are whatever you negotiate, so write them down.

  • License number on every offer of services, proposal, bid and contract (s. 489.119(5)(b)).
  • Recovery Fund and lien notices in residential contracts above $2,500, subject to the conditions in the statutes. The lien notice warns that unpaid subcontractors and suppliers can claim against your property, and advises requiring written lien releases before payment (ss. 489.1425, 713.015).
  • Final payment affidavit. The contractor must give you a sworn affidavit that lienors who served notice are paid, or listing those who are not. The owner holds final payment until it arrives (s. 713.06(3)(d)).
  • Scope, dates and payments. Hillsborough County says a contract should cover scope, start date, estimated duration and payment schedule. UF/IFAS adds a definition of completion, a warranty and separate change orders.

A federal rule, not a Florida contract requirement, can also matter: the FTC’s Cooling-Off Rule gives some buyers until midnight of the third business day to cancel certain sales made in the home, but it does not apply if you sign at the contractor’s permanent place of business, and emergencies and repair visits you requested are excluded. Ask the contractor and an attorney whether it applies to your contract (FTC page).

The $2,500 line is not the $7,500 or $15,000 figure in Florida’s permit rules; our guide to contractor vs. general contractor in Florida puts all three in one table.

How do I compare general contractor bids?

Put every bid on the same scope sheet, name each pricing model, and compare what is included before you compare totals.

  1. 01

    Match the scope

    Give every contractor the same layout, selections and appliance list, and list what each allowance buys. A lower total often means a smaller scope.

  2. 02

    Name the model

    Fixed, cost-plus or capped? For cost-plus, ask what the fee is calculated on and what the cap is.

  3. 03

    Check the payments

    Compare each deposit and milestone with s. 489.126.

  4. 04

    Ask about gaps

    Ask contractors to explain large differences, as the FTC advises. UF/IFAS warns against treating the lowest price as the best value.

  5. 05

    Verify before you sign

    Confirm the license and insurance with our guide to checking a Florida contractor license, then use the questions in how to choose a kitchen remodeler.

Pipes and conduit running through a block and lumber frame for an outdoor kitchen island
Pipes and conduit running through the frame of an outdoor kitchen island.

Frequently asked questions

How much does a general contractor charge in Florida?

There is no single rate. The price covers the cost of the work plus overhead and profit, and depends on contract type and scope. NAHB reports 2024 averages of a 29.9% gross and 6.3% net profit margin for remodelers; these are margins, not a markup or a quote.

How much do most general contractors charge?

There is no single standard markup, and no official source sets a typical percentage. Compare the contract model and the written scope instead.

Is a fixed-price or cost-plus contract better?

Neither wins every time. A fixed price gives a predictable total if the scope will not change much after work starts. Cost-plus can suit work with many unknowns, but the owner carries overrun risk unless the contract has a cap.

How much can a Florida contractor ask for as a deposit?

Section 489.126 sets no cap. If the first payment exceeds 10 percent of the price, permit and start deadlines apply unless there is just cause or you agree otherwise in writing. Hillsborough County advises paying no more than 10 percent before work starts.

Is it cheaper to hire a general contractor or manage the trades myself?

It depends. Managing the trades yourself avoids paying a contractor to coordinate but puts scheduling, permits and risk on you. Florida allows owner-builders under conditions (s. 489.103(7)); ask your building department what applies to your property. Our permit guide covers the details for Tampa and Hillsborough County.

Sources

From concept to completion:our design-build process

Hand drawing a navy kitchen layout over a 3D rendering
01Design consultation & 3D kitchen planning

Every project begins with a personalized design consultation where we transform your vision into a detailed 3D layout.

02Permitting & project coordination

Permits and engineering approvals are part of most remodels with structural, electrical, plumbing or mechanical work. Who applies for them is described in your written agreement.

03Precision manufacturing & stone fabrication

Once the layout is approved and permits are cleared, cabinetry and stone fabrication begin together.

04White-glove installation & final completion

Structural work, where the project includes it, and the installation of cabinets, stone and fittings run as one coordinated process, closed out by the final inspections your local building department requires.

Turnkey package

Compare bids on one scope

Ready to talk about the scope of your kitchen? Darvin Kitchen is a Licensed Building Contractor, Florida license CBC 1269832, based in Bradenton. Request a quote and we will contact you.